BATHROOM INSTALLATION / REFUB.

Here we have our later bathroom installation.

This job was done on a vert tight works schedule. Having to coordinate six different trades in this tight schedule is no mean feat in itself. With out having to install the bathroom suite.

We had to remove the old cylinder cupboard to make way for the walk in shower unit.

So before work could start on the bathroom a new pressurised cylinder and a new boiler had to be installed in a new location.

After this preliminary work had been done it was time to attack the bathroom !

We had to strip out the old bathroom suite, Alterations to pipework etc, Install a walk in shower with traditional style valve etc.

Then the wall tiler came in and tiled the floor / shower cubicle area.

Then the joiner came in and installed the wooden panelling around the lower wall areas.

Then we were able to install the remainder of the bathroom  (Bath, Basin, Shower cubicle, 2 Radiators Etc,)

Then it was the turn of the decorator.

Also on this job we can’t forget to mention the Electrician, Builder and Plasterer.

Have a look at the photos and please leave feedback it would be great to hear what you think.

IMG_0221  IMG_0235

IMG_0236  IMG_0237

IMG_0238  IMG_0239

If you would like a bathroom of your dreams where everything is taken care of . Give me a call or contact me via the the contact form.

Thanks for taking time to have a look. Paul.