Latest News Section

Full Bathroom refurb complete with walk in wet room shower area.

My customer and myself were pleased with the final result of this project. We removed the old bathroom suite fully stripped the plaster etc back to the bare brickwork and re-plastered to get the look that my customer wished for. Then we installed under floor heating, a concealed wall hung w/c frame, a wet room former and tanked the room accordingly etc. Then we fully tilled out the bathroom/ wet room with Carrera white wall and floor tiles. After tilling we installed the free standing bath, wall hung vanity unit, wall hung toilet, shower screen, shower controls and finally an electric towel rail. Needless to say our customers couldn’t have wished for anything better. (Their own words).

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.